
Associated Gas Recovery in Iran: From Reducing Routine Flaring to Reliable Metering and Industrial Supply
A sourced analysis of Iran’s 31 October 2026 associated-gas recovery announcement and the role of industrial flow measurement.
Read more
A sourced analysis of Iran’s 31 October 2026 associated-gas recovery announcement and the role of industrial flow measurement.
Read more
Verified coverage of Iran’s Sarajeh underground storage injection milestone, with clear distinctions between inventory, capacity, deliverability and downstream metering.
Read more
Technical coverage of the 31 October 2026 Phase 11 drilling update, distinguishing the 13th well, the 12th well and reported platform capacity.
Read more
An evidence-based analysis of Markazi Province’s reported regulator-connection improvements, GIS incident heatmaps and industrial gas-use monitoring.
Read more
Fact-checked analysis of Iran’s authorization to review gas tariffs and quotas, with implications for metering and data quality.
Read more
A source-based review of Iran’s late-October gas-demand surge, the conditional 20°C conservation estimate, and the role of auditable smart-meter readings.
Read more
Analysis of Alborz Province Gas Company’s 31 October 2026 announcement on 600-plus boiler rooms, distinguishing projected 15–20% gas savings from verified performance.
Read more
A fact-checked explanation of the 15 October 2026 statement on 230 million cubic metres of damaged gas capacity, approximately 100 million restored and 130…
Read more
Evidence-based coverage of Iran’s Region 7 gas transmission report, including 23 staff proposals, a 60 kW solar project, a 30-inch pipeline assessment and seven…
Read more