
South Pars Phase 11 Begins Drilling Its 13th Well: Platform B Capacity Explained
Technical coverage of the 31 October 2026 Phase 11 drilling update, distinguishing the 13th well, the 12th well and reported platform capacity.
Read more
Technical coverage of the 31 October 2026 Phase 11 drilling update, distinguishing the 13th well, the 12th well and reported platform capacity.
Read more
Technical guide to actual and base gas volume, absolute pressure, temperature compensation, compressibility and meter selection.
Read more
A practical guide to low-flow gas meter accuracy, flow range, metrological testing and G2.5 versus G4 selection.
Read more
Evidence-based coverage of Iran’s Region 7 gas transmission report, including 23 staff proposals, a 60 kW solar project, a 30-inch pipeline assessment and seven…
Read more
An evidence-based explanation of Iran’s 14 October 2026 fuel-management meeting, proposed household gas subsidy changes, and the distinction between reported results and expected savings.
Read more